Engine Block Heater Control – QPL – Washington Only

Qualified Products List

List update 8/13/2024

Brand Model Type
ELEproduct CONTROL-X2 Extension Cord
IPLC M210-15 Wall Mounted
IPLC M210TN Wall Mounted
IPLC M210-20 Wall Mounted
Power Badger 1800US Extension Cord
Zerostart V-Lock Block Heater Engine Mounted
Zerostart Threaded Heater Engine Mounted
Zerostart Cartridge Heater Engine Mounted
Zerostart Plate/Bolt-On Heater Engine Mounted

2024 California Program Update

Pacific Power is planning changes to the Wattsmart Business program in California, effective on September 1, 2024.

These changes are part of Pacific Power’s efforts to update the program based on new statewide energy efficiency workpapers and to align with market changes. For an in-depth look at these program changes, please review the program website announcement, summary of changes and redlined incentive tables to show the changes.

Some of the more significant changes are highlighted below:

  • Revised eligibility for T8 TLED Lamp from UL A/B dual mode to UL Type A.
  • Modification of Advance Lighting Controls to eliminate controls-only upgrade.
  • Incentive increase for Interior Lighting (site-specific).
  • Advance Lighting Controls measure (site-specific).
  • New Exterior Lighting measure offerings.
  • Heating mode requirements added to Packaged Terminal Heat Pump measure offerings.
  • Revised eligibility requirements for Heat Pumps, Air Cooled Heat Pumps, replacing electric resistance heating (retrofit-only) and Heat Pump Water Heaters.

Incentive calculator tools will be updated to reflect the revised offerings. The tools are available to all approved Wattsmart Business Vendors on the Wattsmart Business Vendor Portal.

Important Dates to Remember

To guarantee lighting project incentives under the current offerings, complete applications must be received by the program no later than August 15, 2024. Projects received after August 15th may be eligible for the current incentive if the Incentive Offer can be issued prior to September 1, 2024. Valid applications will be issued Incentive Offers on a first-come, first-served basis. Incentive Offer letters issued on or after September 1, 2024, will be based on the new incentive structure.

For all other lighting and non-lighting equipment purchases that do not require pre-approval, the program updates apply to all equipment purchased on or after September 1, 2024. Equipment purchased before September 1, 2024, may qualify for incentives that were available under the previous incentive structure, and applications with accompanying invoices must be submitted within six months of the purchase date.

If you have any questions, please reach out to your local outreach coordinator.

Contacts

Washington

Technology: Lighting / Mechanical / Non-lighting

Nick Jones

Nick Jones

Senior Energy Specialist

William Gatchel

William Gatchel

Senior Energy Specialist

Lance Benedict

Lance Benedict

Field Energy Specialist

Liliana Causor

Liliana Causor

Field Specialist

509.941.9414 lili.causor@evergreen.energy

Hablo Español

Technology: Small Business Lighting

Marcelino Osorio

Marcelino Osorio

Diversity & Community Outreach Coordinator

509.930.1562  marcelino.osorio@evergreen.energy

Hablo Español

Community Outreach

Candy Hernandez

Candy Hernandez

Community Outreach Coordinator

509.317.0075 Candy.Hernandez@evergreen.energy

Hablo Español

California

Technology: Lighting Retrofits / New Construction/Major Renovations and all other

Josh Girard

Josh Girard

Energy Specialist

California and Washington

Technology: Irrigation, Compressed Air, Farm & Dairy, Wastewater & Other Refrigeration

Christian Bernard

Christian Bernard

Vendor Resources

Welcome to your resources page. Check back often for helpful new documents and videos. 

This video is for vendors who know their customer’s account number. It will help you learn how to:

  • Check on project statuses.
  • Make account updates.
  • Access lighting and non-lighting tools.
  • Check eligibility.
  • Fill out the General Application.

To better view this video, click on the expand icon to see it on your entire screen.

This video is for vendors who don’t know their customer’s account number. It will help you learn how to:

  • Check on project statuses.
  • Make account updates.
  • Access lighting and non-lighting tools.
  • Check eligibility.
  • Fill out the General Application.

To better view this video, click on the expand icon to see it on your entire screen.

Washington Incentives for Smart Engine Block Heater Controllers

They Are Here! Smart Engine Block Heater Controller Incentives

Engine block heater controller attached to a vehicle

 

In cold weather, diesel motors can struggle to start up in the morning. Many motors come with block heaters that use electricity from the grid to preheat the motor for an easier start. Out of habit, many customers plug in the heaters in the evening and let them run all night so that the motor is warm by the morning. However, the heaters run unnecessarily long, each using several hundred watts. Ideally, heaters only need a few hours, at most, to preheat a motor.

Next, basic timers were added to the block heaters, which were considered an energy efficiency measure. They allowed warmers to run only before they were needed, but they still required manual intervention and planning.

Since several new smart controls have become available for engine block heaters, we’ve had many customers ask about incentives. Select a button below for more details on engine block heater and other incentives.

Pacific Power offers the following:

These smart controllers are superior because they use variables such as ambient temperature. Using ambient temperature helps to reduce block warmer run times. When setting preheat times using a block timer alone, you are forced to plan for the worst-case scenario. Engine block heater controllers dynamically adjust schedules to be the most efficient.

Don’t hesitate to get in touch with Marcelino Osorio at WattsmartBusiness@evergreen.energy or (509) 930-1562 if you or your customers feel you might be a good fit for this new measure.

Link to the General Application

Link to Washington Non-Residential Energy Efficiency Measure

Link to Engine Block Heater Controller Handout